Snow & Subsequent Melt Damage
There was extensive damage caused to the controls and stations for the new City Center cable car system as a result of snow on the Las Vegas strip and subsequent melt.
J.S. Held was retained, along with equipment specialists, to review the remedial protocols, testing requirements, and physical damage sustained. We also monitored the time and material evaluation, the cleanup process, and audited all submitted costs.